Blog Archive: 2017 September

Construction update: Third (or maybe fourth) week of September

By Jeff Zeitler on Wednesday, September 27th, 2017

Here is where we stand partway through the fourth week of September:   We have floor tile in both bathrooms and wall tile is now being installed. We have floor tile behind the bar and wall tile is going up there as well. Concrete board and FRP have been installed behind the bar. In front […]


Construction update: Second week of September

By Jeff Zeitler on Wednesday, September 13th, 2017

Since last post we have: Finished patching and painting the front steps and landing Taped and mudded all the taproom drywall Drywalled the entire basement Our plumbing and HVAC contractor have finished installing our new heating and cooling system, and plumbing is roughed in and inspected. Electrical stuff is mostly roughed in at this point. […]


We want you!

By Jeff Zeitler on Sunday, September 10th, 2017

Yes, we have finally posted jobs at Urban Forage!  We’re seeking Bartenders, an Event Coordinator and a Wine and Cider Production Assistant.  All jobs have been posted on Indeed, and if they’re not viewable already, they will be soon. I’m posting the descriptions in their entirety below.  If you wish to apply, please send a […]